Nitrate Implementation Measures Study (NIMS)

Project Description:  CV-SALTS is implementing a study to evaluate nitrate contamination in the groundwater basins of the Central Valley and develop appropriate implementation measures to mitigate this contamination using a phased approach that includes providing safe drinking water, reducing or eliminating impacts to drinking water sources and implementing managed restoration activities where needed to restore beneficial uses in groundwater. The implementation measures, which will be incorporated into the SNMP, will be phased and a prioritization methodology will be used to rank groundwater basins in order of priority – where risk reduction from nitrate in groundwater is optimized to facilitate use of the limited resources available. Findings from NIMS will be evaluated along with SSALTS findings to develop a coordinated salt and nitrate management program for incorporation into the SNMP.

Project Status: Project was initiated in August 2015 and completed in May 2016.

Read more ...

Surveillance & Monitoring Program

Project Description: The purpose of this project is to develop a Surveillance & Monitoring Program (SAMP) that will allow for statistically-defensible ambient water quality determinations and completion of trend analyses. The SAMP, which will be included in the developing Central Valley Salt and Nitrate Management Plan (SNMP), is being designed to fulfill the monitoring requirements of the planned Basin Plan Amendments (BPA) that will be adopted to support implementation of the SNMP.

Project Status: Project was initiated in March 2015 and was completed in December 2016.

Read more ...

Implementation Planning

This tab provides access to all available Implementation Planning projects and documents. Summary descriptions of each project area can be found in the articles below. Click on the "Read More..." button to find more information about each project, as well as a list of the main supporting documents for that project.

instructThe most recent listing of available Implementation Planning documents can be found in the folders immediately below. Select the folder icon to expand the list. Clicking on the “Last Updated On” column heading will display the list in either ascending or descending order by date.

 

Implementation PlanningImplementation Planning

#NameLast UpdatedDownloaded
120160412 Draft SAMP Report20160412 Draft SAMP Report (Details)Dec 21, 201666 times
2Final Revised SAMP 122016Final Revised SAMP 122016 (Details)Dec 20, 201680 times
3SAMP-Presentation to Executive Committee_02.24.16SAMP-Presentation to Executive Committee_02.24.16 (Details)Oct 21, 201656 times
420161020 N Prioritization final rev120161020 N Prioritization final rev1 (Details)Oct 19, 2016101 times
520161020 N Prioritization final rev1 print20161020 N Prioritization final rev1 print (Details)Oct 19, 201670 times
620160629 SAMP Report Revised20160629 SAMP Report Revised (Details)Sep 15, 2016123 times
7August 1 Presentation 072616August 1 Presentation 072616 (Details)Jul 27, 2016114 times
8Draft Salinity Management Strategy 072616Draft Salinity Management Strategy 072616 (Details)Jul 27, 2016115 times
9Surveillance and Monitoring Program (SAMP) -Final Report 06.30.16Surveillance and Monitoring Program (SAMP) -Final Report 06.30.16 (Details)Jul 06, 2016222 times
1020160331 NIMS Report rev120160331 NIMS Report rev1 (Details)May 23, 2016417 times
1120150807 NIMS Final Workplan ExecComm Approved Submitted20150807 NIMS Final Workplan ExecComm Approved Submitted (Details)May 23, 2016253 times
12Nitrate Implementation Measures Study (NIMS) - Final ReportNitrate Implementation Measures Study (NIMS) - Final Report (Details)Apr 02, 2016356 times
13NIMS Proposed SNMP Implementation Framework - Presented to Executive Committee 11.18.15NIMS Proposed SNMP Implementation Framework - Presented to Executive Committee 11.18.15 (Details)Nov 17, 2015270 times
1420151020 NIMS Technology Matrix20151020 NIMS Technology Matrix (Details)Oct 20, 2015230 times
15Nitrate Implementation Measures Study (NIMS) - Preliminary Findings - Presented to Exec Committee 10.21.15Nitrate Implementation Measures Study (NIMS) - Preliminary Findings - Presented to Exec Committee 10.21.15 (Details)Oct 19, 2015361 times
16NIMS Final Workplan Executive Committee ApprovedNIMS Final Workplan Executive Committee Approved (Details)Aug 26, 2015422 times
1720150811a SAMP 3 Slides Page (1)20150811a SAMP 3 Slides Page (1) (Details)Aug 12, 2015285 times
18Surveillance and Monitoring Program (SAMP) - Policy Related Questions for Exec Committee_PowerpointSurveillance and Monitoring Program (SAMP) - Policy Related Questions for Exec Committee_Powerpoint (Details)Aug 12, 2015275 times
1920150804 NIMS Revised Final Workplan ExecComm Submitted20150804 NIMS Revised Final Workplan ExecComm Submitted (Details)Aug 04, 2015311 times
2020150707 NIMS Final Work Plan20150707 NIMS Final Work Plan (Details)Jul 07, 2015347 times
2120150706 NIMS Work Plan20150706 NIMS Work Plan (Details)Jul 07, 2015361 times
22PRESENTATION: Nitrate Implementation Measures (NIMS) - Draft Work PlanPRESENTATION: Nitrate Implementation Measures (NIMS) - Draft Work Plan (Details)Jun 24, 2015434 times
23Nitrate Implementation Measures Study (NIMS) - DRAFT Work PlanNitrate Implementation Measures Study (NIMS) - DRAFT Work Plan (Details)Jun 20, 2015373 times
24CDM Smith SAMP SOW 022715CDM Smith SAMP SOW 022715 (Details)Mar 29, 2015738 times

SSALTSSALT

#NameLast UpdatedDownloaded
1Final Phase 3 Report 120616Final Phase 3 Report 120616 (Details)Dec 11, 201688 times
220161011 Phase 3 Final Report20161011 Phase 3 Final Report (Details)Oct 12, 2016132 times
3SSALTS Final Phase 2 Report - Development of Potential Salt Management StrategiesSSALTS Final Phase 2 Report - Development of Potential Salt Management Strategies (Details)Dec 18, 2015526 times
4SSALTS Final Phase 1 Report - Identification & Characterization of Existing Salt Accumulation AreasSSALTS Final Phase 1 Report - Identification & Characterization of Existing Salt Accumulation Areas (Details)Dec 18, 2015463 times
5SSALTS Project Revised Phase 3 Draft ReportSSALTS Project Revised Phase 3 Draft Report (Details)May 21, 2015481 times
620150515 SSALTS Implementation Summary20150515 SSALTS Implementation Summary (Details)May 20, 2015443 times
7Strategic Salt Accumulation Land and Transportation Study V 3Strategic Salt Accumulation Land and Transportation Study V 3 (Details)Apr 02, 2015505 times
820150327 TAC SSALTSPhase 3 Presentation20150327 TAC SSALTSPhase 3 Presentation (Details)Mar 23, 2015472 times
920150318 SSALTS Phase3 Rpt20150318 SSALTS Phase3 Rpt (Details)Mar 18, 20151108 times
10SSALTS - Progress Update_October 15, 2014SSALTS - Progress Update_October 15, 2014 (Details)Oct 12, 2014888 times
11SSALTS - Draft Phase 2 Report – Development of Potential Salt Management Strategies_20140902SSALTS - Draft Phase 2 Report – Development of Potential Salt Management Strategies_20140902 (Details)Sep 02, 2014773 times
12SSALTS - Draft Phase 2 Report – Development of Potential Salt Management Strategies_20140715SSALTS - Draft Phase 2 Report – Development of Potential Salt Management Strategies_20140715 (Details)Jul 16, 20141730 times
13SSALTS Progress Update to TAC on May 30, 2014SSALTS Progress Update to TAC on May 30, 2014 (Details)May 28, 20141000 times
14SSALTS_Phase 1_CommentResponseSheet_120913SSALTS_Phase 1_CommentResponseSheet_120913 (Details)Dec 11, 2013668 times
15SSALTS_Phase 1 Draft Final Report_120913SSALTS_Phase 1 Draft Final Report_120913 (Details)Dec 11, 20131000 times
16SSALTS-Task 1-4_TAC-Mtg-10-15-13SSALTS-Task 1-4_TAC-Mtg-10-15-13 (Details)Oct 14, 2013611 times
17SSALTS Table Handout (8 X 11)SSALTS Table Handout (8 X 11) (Details)Sep 11, 2013464 times
18SSALTS Table Handout (11 X 17)SSALTS Table Handout (11 X 17) (Details)Sep 11, 2013643 times
19SSALTS Tasks 1-4 for TAC 09.12.13SSALTS Tasks 1-4 for TAC 09.12.13 (Details)Sep 11, 2013454 times
20Section 9_Tulare Lake_041913Section 9_Tulare Lake_041913 (Details)May 13, 20131062 times
21Section 11_Industrial_Food_Processing_041613Section 11_Industrial_Food_Processing_041613 (Details)Apr 16, 20131012 times
22Section 8_Stevinson WD_041613Section 8_Stevinson WD_041613 (Details)Apr 16, 2013971 times
23SSALTS-TAC-Meeting-4-17-13-FinalSSALTS-TAC-Meeting-4-17-13-Final (Details)Apr 16, 2013639 times
24SSALTS - Task 1.3 Draft TMSSALTS - Task 1.3 Draft TM (Details)Mar 27, 2013360 times
25SSALTS - DRAFT: Task 1.3 Characterization of Salt Accumulation Study AreasSSALTS - DRAFT: Task 1.3 Characterization of Salt Accumulation Study Areas (Details)Mar 25, 2013775 times

 

The Economic Impacts of Central Valley Salinity

Project Description: The purpose of this study was to measure the economic impacts of increasing salinity in the Central Valley out to the year 2030. To conduct the analysis, the project team assumed that there would be no change in current salt management policies; as such, the findings from the analysis represented the economic impacts associated with taking no action. The study was conducted on an aggregate valley-wide basis that averaged salinity effects and costs. Based on estimates of increasing levels of salinity under existing conditions, the study estimated the direct economic effects on industry, residential, food processing, confined animal operations, and irrigated agricultural production in the Central Valley using different physical and economic models.

Project Status: This project was completed in 2009.

Read more ...

Strategic Salt Accumulation Land and Transport Study (SSALTS)

Project Description: CV-SALTS is implementing a study to identify the range of viable Central Valley alternatives for salt disposal (taking into account regulatory, institutional, economic, and technological issues) to provide input for consideration during development of the Salt/Nutrient Management Plan (SNMP) for the Central Valley. Potential alternatives for salt disposal range from expanded use of existing salt disposal areas, establishment of new salt disposal areas within the Central Valley, export or transport of salt out of the Central Valley, or some combination of the above. The findings from this study will provide input to policymakers regarding where opportunities exist to dispose of salt over the long term in a sustainable manner. In addition, the findings will provide important input to the development of the SNMP under Phases 2 and 3 of Conceptual Model, and provide information to support development of the Basin Plan Amendment to adopt a Central Valley SNMP. Status: Project was initiated in December 2012. Phase 1, which focused on an evaluation of current salt disposal practices at selected study areas, was completed in December 2013. Phase 2, which concentrates on the development of potential future salt disposal/treatment alternatives for the Central Valley, was completed in September 2014. Phase 3 is evaluating the potential salt disposal/treatment alternatives identified in Phase 2 to develop implementation measures and a phased implementation strategy for inclusion in the SNMP.

Project Status: A draft Phase 3 report was completed in spring 2015; in coordination with the development of the CV-SALTS Salinity Management Strategy, the Final Phase 3 report was completed in December 2016.

Read more ...